Project Status:

The Final Hearing for consideration of the project was held by the Board of County Commissioners on June 21, 2021. At this hearing, the Commissioners dismissed the petition and ordered that all costs for administration and engineering of the project be assessed to the landowners in the same ratio as determined for the Estimated Schedule of Assessments. This Final Schedule of Assessments is currently being prepared.

 

Project Summary:

The request of this petition is to provide an improved outlet for both surface and subsurface drainage. The work being proposed includes surface grading, subsurface drain replacement, and new subsurface drain installation.

 

Project Documents:

Commissioners’ Hearings:

Link to watch the Commissioners’ final hearing on this project.